Category : Search result: PMC missing links project


PMC to repair Hadapsar flyover, work starts in 2 months

Pune Municipal Corporation plans a Rs 5 crore overhaul of the 20-year-old Hadapsar flyover, replacing 9 expansion joints and 268 bearings. Work starts in two months. Read details on traffic plans and resident concerns.

95-Year-Old Qadian-Beas Rail Line Project Revived

The 40-km Qadian-Beas rail line, stalled since 1929, is finally set for construction. Railway Minister directs officials to clear all hurdles, promising a boost to Batala's industry. Read the full story.

Afghan Evacuee Arrested in US for ISIS-K Links

An Afghan national resettled in the US under Operation Allies Welcome faces federal charges for alleged ISIS-K ties. Details on the arrest, charges, and security implications.

Pune's 12-Year Road Delay Sparks Citizen Outcry

Frustrated by over a decade of delays, Pune's Karvenagar residents demand a white paper on the stalled Shivne-Kharadi riverbed road. Incomplete works cause severe traffic bottlenecks and safety hazards. Read more.

BMC floats tender for 45m elevated road in Mumbai

BMC invites PMC tender for 45m-wide elevated road connecting Dahisar West to Bhayander West, final leg of Mumbai Coastal Road corridor. Project to reduce travel time by 30-45 minutes.

Six Minor Girls Missing Across Navi Mumbai

Six minor girls disappeared from various Navi Mumbai locations in recent days. Police investigating multiple kidnapping cases amid growing safety concerns. Read latest updates.

Page 1 of 4