Madras HC orders probe into ₹93.4 crore CMRL land payout
Madras High Court orders investigation into ₹93.4 crore compensation paid by CMRL for land acquisition in Chennai's Koyambedu without proper title verification. Read the full story.
Madras High Court orders investigation into ₹93.4 crore compensation paid by CMRL for land acquisition in Chennai's Koyambedu without proper title verification. Read the full story.
The proposed flyover from Goldwins to Neelambur in Coimbatore faces uncertainty as CMRL's metro plans create a hurdle. Get the latest details on the Rs 600 crore project.
Chennai Metro's Phase II barricaded walkways, costing ~₹30 crore, are poorly lit, unsafe, and causing daily hardship. Officials promise removal by 2028, but pedestrians demand immediate fixes.
A Chennai Metro train stalled in an underground tunnel due to a rare dual battery failure. 25 passengers were safely evacuated. Read details on the incident and CMRL's response.
25 passengers were safely evacuated from a stalled Chennai Metro train in an underground tunnel. CMRL officials cite a rare dual battery failure as the cause. Read details.
Greater Chennai Corporation postpones Velachery flyover work after CMRL request. The projects overlap by 650m. New construction expected to start in January 2024.
Chennai Metro Rail Limited announces installation of advanced anti-drag passenger door systems across 52 trains following recent safety concerns, enhancing commuter safety in Phase 1 operations.