Category : Search result: sewer line problems Ghaziabad


Bengaluru Metro to add 79km, Pink Line by 2026

BMRCL announces a major push to operationalise 79km of new Metro corridors in Bengaluru by 2027, including the airport line. Details on timelines, new trains, and the Orange Line tender.

Ghaziabad ITMS deadline extended again to January 15

Ghaziabad's Integrated Traffic Management System faces another delay until Jan 15, 2025. Learn about the project's troubled history, missed deadlines, and resident frustration. Will it finally bring order?

Ghaziabad man arrested for killing stepdaughter, 18-month-old

A 26-year-old man in Ghaziabad's Khoda area was arrested for allegedly murdering his 18-month-old stepdaughter following frequent arguments with his wife. The accused fled after the crime but was nabbed during routine police checking.

Ghaziabad: Rs 43 Lakh Lost in Online Investment Scams

Two Ghaziabad residents lost over Rs 43 lakh in separate online investment scams. Fraudsters used Facebook and WhatsApp to lure victims with promises of high returns. Police have registered FIRs and investigations are ongoing.

Noida Smog Crisis: AQI Severe for 3rd Consecutive Day

Noida's air quality remains in the 'severe' category for the third day, with AQI at 437. Residents resort to rooftop water sprinkling as PM2.5 levels hit the maximum limit. Read for details and expert analysis.

BLOs Suffer as Election Roll Revision Deadline Extended

Booth-level officers in Noida and Ghaziabad faced immense pressure during the Special Intensive Revision of electoral rolls, with tight deadlines taking a toll on health and personal lives. Read about their ordeal.

Page 1 of 4