Survey Completed for Pathankot-Jogindernagar Railway Broad Gauge Conversion
Survey for Pathankot-Jogindernagar Broad Gauge Line Done

In a significant development for Himachal Pradesh's railway infrastructure, the crucial preliminary survey for converting the historic Pathankot-Jogindernagar narrow gauge line into a broad gauge line has been successfully completed. This milestone brings the long-awaited project one step closer to reality, promising to revolutionize connectivity and boost the socio-economic prospects of the Kangra region.

Project Details and Survey Completion

The survey, a critical first step in any major railway project, has been finalized by the relevant railway authorities. This comprehensive assessment lays the groundwork for the ambitious conversion of the existing narrow gauge (2 feet 6 inches) track to a standard broad gauge (5 feet 6 inches) line. The project covers the entire stretch from Pathankot in Punjab to Jogindernagar in Himachal Pradesh's Mandi district.

Kangra Member of Parliament, Kishan Kapoor, confirmed the completion of the survey. He has been actively pursuing this project, recognizing its immense potential for the region. The completion of the survey is a direct result of persistent follow-ups and advocacy by local representatives with the Union Ministry of Railways.

Historical Significance and Modern Imperatives

The Pathankot-Jogindernagar line, often referred to as the Kangra Valley Railway, is a heritage narrow gauge line known for its scenic beauty. However, its technical limitations have long been a bottleneck for efficient transportation. The conversion to broad gauge is seen as an essential modernization step to address several key issues:

  • Enhanced Capacity: Broad gauge lines can handle heavier loads and longer trains, significantly increasing passenger and freight capacity.
  • Better Speed and Safety: Modern broad gauge tracks allow for higher speeds and improved safety standards compared to the aging narrow gauge infrastructure.
  • Seamless Connectivity: Conversion will enable direct integration with the rest of India's extensive broad gauge network, eliminating the need for time-consuming transshipment of goods and passengers.

This upgrade is expected to provide a much-needed impetus to tourism, agriculture, and industry in the picturesque Kangra Valley by ensuring faster and more reliable transport links.

Next Steps and Future Impact

With the survey now complete, the project moves into its next critical phases. The detailed survey report will be analyzed to prepare a Detailed Project Report (DPR), which will outline the technical specifications, estimated costs, and implementation timeline. Funding allocation and final approval from the Railway Board will follow based on the DPR.

The broad gauge conversion is poised to have a transformative impact on Himachal Pradesh, particularly the Kangra district. It promises to:

  1. Reduce travel time drastically for passengers moving between the region and major cities.
  2. Provide a cost-effective and efficient route for transporting local produce like fruits, vegetables, and handicrafts to larger markets.
  3. Boost tourism by making scenic destinations in Kangra and Mandi districts more accessible via a comfortable and modern rail link.
  4. Generate employment opportunities both during the construction phase and in the long term through improved economic activity.

While an exact timeline for the start of physical work is yet to be announced, the completion of the survey marks the end of the preliminary stage and the beginning of concrete planning. Local stakeholders and residents are hopeful that the project will receive swift approvals and adequate funding in upcoming railway budgets, turning this vision of enhanced regional connectivity into a tangible reality.