60 Injured in Tunnel Train Collision at Uttarakhand's THDC Project
60 injured in Uttarakhand tunnel train collision

A serious railway accident inside a tunnel at a major hydroelectric project in Uttarakhand has resulted in multiple injuries. The incident involved a collision between two locomotive trains late on Wednesday evening.

Details of the Chamoli Tunnel Accident

The collision occurred inside a tunnel that is part of the THDC India Limited project in the Chamoli district of Uttarakhand. According to the official statement from Chamoli District Magistrate Gaurav Kumar, the trains were carrying a total of 109 people at the time of the crash. The impact of the collision caused significant damage and led to a major emergency response.

Rescue Operations and Casualty Figures

Out of the 109 individuals on board, 60 people sustained injuries of varying severity. The accident, which took place late in the evening, prompted immediate rescue and relief efforts. Local authorities, along with project officials and medical teams, swiftly mobilized to the remote tunnel site to evacuate the injured and provide necessary first aid.

The injured were transported to nearby medical facilities for treatment. The condition of some of the victims is reported to be serious, and a full assessment of the situation is ongoing. The focus remains on ensuring all affected individuals receive proper medical care.

Investigation and Immediate Aftermath

While the primary focus has been on rescue and medical aid, questions are being raised about the cause of the collision inside the confined space of the tunnel. An investigation is expected to be launched to determine the exact sequence of events that led to this unfortunate accident.

The incident has cast a spotlight on safety protocols for construction and logistical operations within large infrastructure projects like the THDC initiative. This accident, occurring on December 31, 2025, marks a tragic end to the year for the region and the families of those involved.

Officials have assured that all necessary support is being provided and that a thorough probe will be conducted to prevent such occurrences in the future.