A third entry is being planned for the Metro depot station, which will connect it directly to the Subhash Nagar side. Officials have confirmed that the base construction for this new entry is complete, but its opening for passenger use will depend on final approval from the Railways. Once cleared, the new access point will allow commuters from Subhash Nagar to reach the depot station directly, eliminating the need to drive or walk long distances.
Enhancing Accessibility and Ridership
The move is aimed at easing connectivity and attracting more passengers to a system that has struggled to draw commuters since its launch. By opening the depot station to the residential catchment area of Subhash Nagar, planners hope to make the metro more accessible for daily users. The new entry is expected to significantly reduce travel time and effort for residents, potentially boosting overall ridership numbers.
Project Status and Next Steps
While the construction groundwork is complete, the final go-ahead from the Railways is pending. Officials are optimistic about receiving the necessary approvals soon, after which the entry will be operational. This development is part of broader efforts to integrate the metro with surrounding neighborhoods and improve public transport connectivity in the region.



