Bengaluru's Pothole Crisis: CM Siddaramaiah Gives 7-Day Ultimatum for Permanent Repairs
Bengaluru's 7-day pothole repair deadline by CM

In a decisive move to address Bengaluru's perennial pothole problem, Karnataka Chief Minister Siddaramaiah has issued a strict one-week deadline to civic authorities for comprehensive road repairs across the city.

The Chief Minister delivered his ultimatum during a high-level meeting with Maheshwar Rao, Chairman of the Bangalore Development Authority (BDA), emphasizing the urgent need for permanent solutions rather than temporary fixes that have characterized previous repair efforts.

The Seven-Day Race Against Time

Specific instructions were given to use single-layer tar technology for all pothole repairs, a method believed to provide more durable results compared to conventional patchwork approaches. This directive comes as Bengaluru continues to grapple with monsoon-induced road damage that has plagued commuters and residents alike.

Accountability and Monitoring

The Chief Minister's office has made it clear that this isn't just another routine repair order. Strict monitoring mechanisms will be put in place to ensure compliance with the deadline and quality standards. The Bruhat Bengaluru Mahanagara Palike (BBMP) has been directed to mobilize all necessary resources and manpower to meet this ambitious target.

Public Reaction and Expectations

Bengaluru citizens, who have long endured the city's deteriorating road infrastructure, are watching closely to see if this initiative will bring the relief they've been promised. The success of this week-long drive could set a new precedent for how urban infrastructure challenges are addressed in India's technology capital.

With the monsoon season continuing to test the city's resilience, all eyes are on the BBMP to deliver on the Chief Minister's directive and provide Bengaluru with the smooth, safe roads its residents deserve.