Category : Innovations


DNP R&D Centre Opens at IIT Hyderabad with JICA Aid

Dai Nippon Printing Co inaugurated an R&D centre at IIT Hyderabad, supported by JICA. It will focus on mobility and healthcare projects, including wireless EV charging and pharmaceutical manufacturing.

1948 McDonald's Reset That Created Fast Food Model

In 1948, the McDonald brothers closed their drive-in for three months to radically overhaul operations, cutting the menu and firing carhops to create an assembly-line system that birthed global fast food.

Pocket Gophers Restored Mount St. Helens Ecosystem

In 1980, scientists introduced pocket gophers to Mount St. Helens for 24 hours. Their digging revived the ecosystem by bringing nutrients and fungi to the surface, leading to remarkable plant recovery.

Oben Electric Launches Rorr Evo at Rs 99,999

Oben Electric expands its electric motorcycle lineup with the Rorr Evo, priced at Rs 99,999 for first 1,000 customers. Features 180 km range, fast charging, and smart connectivity.

MahaMetro Installs Solar Panels Between Rail Tracks

MahaMetro has installed a 50-kWp solar PV system between rail tracks at its Hingna depot, a first in India. The pilot project will generate 70,000 units of green energy annually, reducing 65 tonnes of carbon emissions.

NCC to Introduce Hi-Tech Drone and Cybersecurity Courses

The National Cadet Corps (NCC) plans to include drone handling and cybersecurity in its training. Nagpur may become a national drone training hub. The NCC also seeks better infrastructure and aims to groom cadets for SSB interviews.

Tatya Tope's 1857 Letter Found in MP Archives

A letter signed by Tatya Tope from 1857 was discovered in Madhya Pradesh archives, revealing meticulous planning and coordination before the revolt. The discovery offers new insights into the rebellion's early stages.

Sagara Science Forum: Science Beyond Syllabus

Sagara Science Forum uses hands-on camps and interactive sessions to challenge rote learning and inspire students to engage with science in new ways, fostering curiosity and practical knowledge.

Jaipur Solar-BESS Integration Stalled Despite SOPs

Despite new SOPs for BESS integration with solar projects in Jaipur, developers say 500 MW projects remain stalled due to unclear 15-month grace window for battery installation, risking Rs 2,000 crore investments.

Page 22 of 81
Pickt mobile sticky banner — logo, tagline and CTA button