Category : Search result: priority sectors Shimla


Shimla Bypass Tunnel 5 Breakthrough Achieved

Engineers connect both ends of Tunnel 5 on Shimla Bypass, a key milestone for the 27.4-km corridor. The project promises to cut travel time by an hour and boost tourism, healthcare, and agriculture logistics. Read more.

Axis Securities: Nifty 50 to Hit 28,100 in 2026

Axis Securities forecasts a strong 2026 for Indian stocks, with Nifty 50 reaching 28,100. Key drivers include easing headwinds and a shift to earnings-driven growth. Discover the top sectors to watch.

Two Arrested with Chitta in Shimla

Shimla Police apprehend two individuals and seize 1.5 grams of chitta (heroin) near the ISBT. Read about the ongoing crackdown on drug trafficking in Himachal Pradesh.

Shimla Winter Carnival Now a Permanent Annual Event

Shimla's iconic Winter Carnival is now a permanent annual fixture, set to illuminate the holiday season from December 26-29 with cultural performances, food, and sports. Discover the schedule!

US Jan 2026 Visa Bulletin: Key Dates for Indians

The US State Department has issued the January 2026 Visa Bulletin with priority dates for family and employment visas. Check the latest filing and final action dates for Indian applicants here.

Shimla's 150-Year Struggle with Monkey Menace

Explore Shimla's complex 150-year history with monkeys, from colonial-era pets to modern-day pests. Discover the ecological and urban challenges of this unique coexistence.

Himachal School Heads Defy Annual Day Schedule Orders

Himachal's education directorate cracks down on govt schools holding annual functions in December, violating the November schedule. A temporary reprieve granted till Dec 31 with conditions. Read more.

YEIDA Survey for Noida Airport Industrial Hubs by Dec 26

YEIDA initiates a detailed topographical survey of sectors 8A-8F near Noida International Airport. The Rs 22 lakh project aims to streamline infrastructure planning for upcoming industrial & logistics hubs. Bids invited till Dec 26.

Shimla Sinkhole: GSI Report Reveals Causes

A GSI report identifies underground pipe leaks and tunnel construction vibrations as causes of the Shimla road collapse. An 8-year-old girl fell into the sinkhole. Read the full findings and official recommendations.

Page 1 of 4