Category : Search result: Awandhe bridge murder


Bogibeel Bridge marks 7 years of connecting Assam

India's longest rail-cum-road bridge, the Bogibeel Bridge, completes seven years since its inauguration by PM Modi. Discover how this 4.94-km engineering marvel over the Brahmaputra has revolutionized connectivity and trade in the Northeast.

Gujarat 2025: Tragedy and Triumph in Year-End Review

A year of contrasts for Gujarat: public anger over a bridge collapse and plane crash is balanced by the joy of winning National Games rights and Asiatic lion conservation success. Read the full report.

Gurgaon CNG pump triple murder unsolved after 3 years

Three years on, the brutal murder of three young employees at a Gurgaon CNG pump remains unsolved. The assailants vanished, leaving behind a trail of blood and unanswered questions. Read the full investigation.

Sambhal: Wife, lover kill trader, chop body into pieces

Sambhal police crack a brutal murder case where a shoe trader was killed by his wife and her lover, who then dismembered the body. The crime echoes the infamous Meerut 'blue drum' murder. Read the chilling details.

Bakhtiyarpur-Tajpur Ganga Bridge to Open by May 2026

The Rs 1,822 crore Bakhtiyarpur-Tajpur bridge over the Ganga is 65% complete and on track for a May 2026 launch. It will link NH-31 and NH-28, transforming north-south Bihar connectivity. Read more.

Chandausi Murder: Wife, Lovers Kill & Dismember Husband

In a chilling crime reminiscent of the Meerut Blue Drum case, a Sambhal woman allegedly conspired with her lovers to murder her husband, dismember his body, and scatter the parts. Police have detained three suspects.

Hyderabad's Durgam Cheruvu Bridge Dark for 6 Months

Hyderabad's key Durgam Cheruvu cable bridge has been without lights for six months, creating a major safety hazard for thousands of tech commuters. Authorities cite lapsed maintenance contract.

550-Metre Pontoon Bridge Approved for Kanpur's Ganga Crossing

A 550-metre pontoon bridge will be built near Shuklaganj to ease public movement in Kanpur-Unnao as the new Ganga bridge will take two years. The Rs 1.5 crore project aims to solve a major connectivity crisis. Read the full details.

Pune sets Dec-end deadline for unsafe bridge reports

Pune's district collector mandates action reports on 509 unsafe public structures by December end, following June's Kundmala bridge collapse that killed four. Authorities must detail repairs or demolition plans.

India's tallest cable-stayed bridge built in Sahyadris

Engineers conquer the historic Sahyadri terrain to build India's tallest cable-stayed road bridge at 132 metres. The Mumbai-Pune Expressway link will cut travel by 25 minutes and reduce pollution. Read more.

Page 2 of 4