Category : Search result: National highways project delay


NHAI's Major Safety Audit for NH-66 in Kerala

NHAI initiates one of India's largest geotechnical evaluations on NH-66, investigating 378 sites across Kerala. The audit aims to ensure long-term safety and structural integrity. Read more.

NHAI's Red Highway Protects Tigers & Drivers in MP

India's first 'table-top red marking' highway in Madhya Pradesh's tiger reserve uses innovative design to slow traffic & protect wildlife with 25 animal underpasses. Read how engineering meets ecology.

MLFF Toll System by 2026 to End Stops at Plazas

Union Minister Nitin Gadkari announces a Multi-Lane Free Flow toll system by 2026-end. It will read number plates at 80 kmph, saving fuel and boosting revenue. Read more about India's highway revolution.

AI Digital Toll System Nationwide by 2026: Gadkari

Union Minister Nitin Gadkari announces a nationwide AI-powered, GPS-based toll collection system by December 2026, aiming to eliminate queues and boost efficiency. Learn how this will transform travel.

Deadly 27km NH Stretch to Get 6 Lanes, 13 Underpasses

A notorious 27km bottleneck on the Salem-Kochi NH sees ~100 fatal accidents yearly. NHAI's ₹1800 crore plan for six lanes, underpasses & flyovers awaits approval. Read the full plan to enhance safety.

Mumbai's Mulund Dump Biomining Project Faces New Delay

BMC's ambitious Rs 731-crore biomining project at Mulund dumping ground faces another setback, with the deadline extended to February 2024. Only 5.8 million tonnes of 7.8 million tonnes legacy waste treated so far.

Pune's 12-Year Road Delay Sparks Citizen Outcry

Frustrated by over a decade of delays, Pune's Karvenagar residents demand a white paper on the stalled Shivne-Kharadi riverbed road. Incomplete works cause severe traffic bottlenecks and safety hazards. Read more.

149 EV Charging Stations for Bengaluru Highways

Bengaluru gets a major EV boost with 149 new charging stations on four key national highways. This initiative aims to ease range anxiety and accelerate electric vehicle adoption in the city.

Porvorim 6-Lane Corridor Delayed, New Deadline 2026

The Rs 640 crore Porvorim elevated corridor project faces delays until late 2026. PWD Minister Digambar Kamat cites traffic diversion issues as the cause. Read for details and proposed solutions.

Page 3 of 4